2012 Capital Improvements
|
Town of Perinton
2012 Capital Road Construction
Tentative Schedule
SPECIAL NOTES:
Newly installed concrete is highly susceptible to damage from lawn fertilizers. Please make every effort to avoid having any lawn fertilizer contact the new gutters for at least one month.
Also, for proper lawn growth to occur in areas that have recently been topsoiled and seeded, it is imperative the area be watered on a regular basis.
|
|
|
Work Description |
Road Construction
(Streets are listed alphabetically) |
|
|
|
Section 1 |
Section 2 |
|
Peachtree Lane, Smallwood Drive
Valley Brook Drive, Woodbridge Terrace, Waterford Way, |
Amity Court, Bending Oak Drive, Cambric Circle, Little Acorn Circle, Mattock Place, Red Oak Lane |
Tota
Total Length: 4.34 miles |
|
Phase I
Repair of Drainage Inlets |
Section 1:
Section 2: |
Valleybrook Drive, Waterford Way, & Woodbridge Terrace completed
Peachtree Lane and Smallwood Drive currently underway
Tentatively beginning the week of May 2nd |
|
|
|
|
Phase II
Repair of Damaged Concrete Gutters |
Section 1:
Section 2: |
4/30/12 through 6/01/12
6/04/12 though 7/06/12 |
|
|
|
|
Phase III
Road Milling |
Section 1:
Section 2: |
6/04/12 through 6/08/12
7/09/12 though 7/13/12 |
|
|
|
|
Phase IV
Road Paving |
Section 1:
Section 2: |
6/11/12 through 6/22/12
7/23/12 though 7/27/12 |
|
|
|
|
|
Status of Perinton Capital Highway Projects, March 14, 2012
O'CONNOR ROAD RELOCATION
This project involves the relocation of the southern end of O'Connor Road to align with Jefferson Avenue. The present O'Connor Road/ Rt. 31F intersection has had a number of accidents and this new signalized location will improve traffic safety. The design of the project has been slowed by the cleanup of the contaminated soil at the Hess gas station. This is now complete and public hearing to discuss the design and acquisition of property is tentatively scheduled for 6:30 pm, May 1, 2012 at the Perinton Town Hall. Construction is scheduled for 2014.
Please Keep In Mind That These Dates Are Tentative. Their Purpose Is To Provide Residents With A General Time Frame For Work To Be Accomplished In Their Respective Neighborhoods. Updated Information And Progress Reports Will Be Available On The Town's Website. You Will Be Notified the Day Before Commencement Of Final Paving. |
|